Skip to content

← All guides

Guides · 24 Nov 2026 · 5 min read

Leggi questa guida in italiano

When the key date slips: what to move and in what order

Your move is booked and the keys come later: what can be moved, what to ask for straight away and how to live a few more weeks among the boxes.

A glass hourglass with grey sand running through it, standing on a dark wooden table crossed by strips of sunlight

You did everything in the right order. Your notice has gone in, the van is booked, you have asked for the day off and half the flat is already packed. Then the phone rings: the keys are not ready. The previous tenant has not moved out yet, the builders are behind, the notary has moved the signing. The new date, if there is one, is two weeks away.

The temptation is to move everything at once, in a morning of phone calls. The trouble is that the things you have booked do not all move in the same way: some can be changed with an email, others depend on someone else's free dates, and one usually cannot be moved at all. The order in which you deal with them decides how much the delay costs you.

First of all, a date in writing

Do not reschedule anything until you have a new date, ideally in writing. "In ten days or so" is not a date: it is a forecast.

Ask whoever owes you the keys three things: the new day, what it depends on, and what happens if it slips again. If you are buying, the way the rogito (the signing of the deed) and its dates work is explained in the article on fitting the rogito and the move together. If you are renting, get the date written down, even just in a message: you will need it when you ask everyone else to move theirs.

Then add a few days of margin, and plan around that date with the margin built in. A second delay can happen, because the cause of the first one is often not sorted yet.

The date that does not move: the home you are leaving

Of all the dates you have fixed, the one for your old home is usually the hardest to change. If you have given notice, the contract ends on that day, and the landlord may already have signed with the next tenant.

This is the first call to make, even before the removal firm. Ask whether you can stay a few more days and on what terms, and if the answer is yes, get it in writing. For the notice period and what goes in the letter, read our guide to giving notice.

If the answer is no, one move becomes two: a first trip to empty the old home, a period when your things are somewhere else, and a second trip when the keys arrive. How to split the boxes between the two trips without shutting away what you use every day is explained in moving in two stages.

What can be moved, if you ask early

After the old home comes everything you have booked with other people. One rule applies here: call on the same day you find out, because the dates that are free today may be taken a week from now.

  • The removal firm or the van. Read your booking confirmation before you call: the terms for changing the date are set by whoever sold you the service, and they are written there.
  • The parking permit. The permit states the days of the occupation, and if the move date changes, those days stay where they are. Ask the office that issued it how to change it, and remember the time needed to put up the signs, covered in the article on the van parking permit.
  • The utilities. If you asked for a voltura or subentro on a set day, check that the day still makes sense: electricity and gas switched on in a home you cannot get into are no use to you.
  • Work. Move your day off last, once all the other dates are confirmed.

A few more weeks among the boxes

Then comes the part nobody plans for: the flat is half packed, and you have to live in it for longer than expected. Sooner or later you need something you have already put away.

With cardboard, getting one thing out means cutting the tape, and then the box needs fresh tape to close; a pile meant for three days stands there for twenty. The Cangubox, by contrast, needs no tape to close: the two hinged flaps of the lid go up, you take out what you are looking for, and they go back down until they lock together. You can pile the boxes up with the lids shut and your things inside, so there is still a path across the room while you wait.

If your Cangubox are rented, the delay affects them too. If you need them beyond the collection date, message us before that day and ask for an extension. We confirm it based on the boxes free on those days, we tell you the cost before confirming, and the minimum extension is seven days. That is why you should ask on the day you learn about the delay, not the day before collection. The same goes for a delivery or collection already agreed: if it falls on a day that no longer works, let us know as soon as you can, and we will do what we can to reschedule it based on availability.

The order of the calls

When the news arrives, follow this sequence:

  1. Get the new date, in writing.
  2. Add a few days of margin.
  3. Call the landlord of the home you are leaving.
  4. Move the removal firm or van, then the permit.
  5. Check the dates for the utilities.
  6. Ask for an extension on the boxes, if you need one.
  7. Last of all, your day off work.

The delay to the keys is not up to you. How much it costs you depends a good deal on you, and above all on how soon you make the third call.

Moving soon?

We bring you the Cangubox, you move, then we come to collect them.