Leggi questa guida in italiano
Moving in before the building work on your new home is finished
Dust, rooms taken over by builders, walls still drying: how to move into a home where the work is not finished without spoiling what you bring.

Your tenancy is up at the end of the month, and the decorator is still at work in the new flat. Or the bathroom is ready but the kitchen is not, and the joiner is back in two weeks. You cannot put the move off, so you move into a home that is still a building site.
A building site has its own rules. If you bring your things in without knowing them, you find out on the first evening, when you open the wardrobe and everything has a fine white coat on it.
Before you set the date: what has to be finished
Some jobs matter more than others. You can live with a few of them going on around you, but not with others, and it helps to know which before you pick the day.
These need to be finished, or at least working:
- The electrics, with the sockets in the room where you sleep and the one for the fridge already connected.
- Water and one usable bathroom. The second bathroom can wait, the first cannot.
- The front door with its final lock, if you have had the door replaced: your things inside a home that does not lock are a risk you do not need to take.
- The floors in the rooms where you put the boxes down. On newly laid parquet, or on resin that still has to dry, you do not stack boxes or push a trolley until the person who laid it tells you it is fine.
These can carry on with you living there: painting one room at a time, fitted furniture, finishing work, skirting boards, lights. They take up one room, not the whole home.
Go through this list with whoever is running the work, in person, and ask for a date for each item. A vague answer on any of the first four is the sign that the moving date has to change, or that you spend the first few nights somewhere else.
The storage room
In a home with work still going on, your things should not be spread around the rooms as they would be in a normal move. They should be kept together, in one room, chosen with one clear rule: the room the builders will stay out of for longest.
It is usually a bedroom that has already been painted, away from where people are cutting, sanding or mixing filler. Close the door, and if there is a gap under it, put a rolled-up towel there. You do not see building dust as it rises. You find it once it has settled.
In there the boxes stay closed, and this is where the container matters. A box left open collects dust. A taped cardboard box, once you have cut it open to look for something, only closes again with more tape. On a Cangubox the lid is part of the box: two halves on hinges that lock together when you close them. You open it to take what you need and close it again without tape, in one movement. In a home where you will be looking for things in boxes for weeks, you make that movement every day.
Stack against the wall furthest from the door, with the heaviest boxes at the bottom, and leave a path so you can reach each column without moving the others. Do not lean anything against a wall that has just been plastered or painted: it has to finish drying, and a stack pushed up against it leaves a mark.
When the work moves on
Building work does not stay in one place. Today the decorator is in the living room, next week they move on to the bedroom you have been using for storage. And the boxes have to move again, inside the home.
This is where you see the difference between a stack you take away in one trip and one you have to take apart box by box. A closed, loaded Cangubox stacks on top of another, and the Dolly comes with every rental: it is a trolley on four swivel wheels with a load capacity of 400 kg stated by the supplier. You stack a column on it and push it into the next room. On a new floor, before you push, check that the wheels are clean and the way is clear of rubble: for the rest, see the article on how to protect a new floor on moving day.
Agree with the builders which room comes when. One question on Monday is enough: "are you starting on the bedroom on Thursday?". That way you move your things the day before, not the same morning with the builders waiting.
And one rule for everyone: the moving boxes do not become the site's storeroom. Paints, solvents, fillers and dirty tools do not go in a Cangubox, because the box comes back to us and then goes to someone else. Those need a place of their own: ask the firm where they keep them, before they end up next to your boxes.
If you think the work might drag on, keep it in mind when you choose the rental length: doubling it does not double the price, and you can see the lengths where you choose a kit. As you empty them, leave both halves of the lid open: that way the empty boxes slot into one another, and until collection they stay in a low column.
Before moving day, do three things: ask whoever is running the work for the date of each essential item, choose the storage room, and find out in which order the work will move from one room to the next.